• Loading tower in Davis Oklahoma - Jim W5JI
  • Green and Yellow are a GOOD thing
  • A true GUY TOOL in action.
  • Post holes the easy way
  • Pile driving 10 foot pipe 5 feet into the ground.
  • Stacking Tower
  • Finishing the hinge section.
  • Testing the folding section
  • Tilting the top for the final section
  • The top  38 feet tilt over for EASY access
  • Looks a little STRANGE doesn't it?
  • Securing the cables to the tower.
  • Ain't life grand - 5Ghz Repeater on top of tower
  • Wait! Where is the Mosley Classic 33??
Thumbnail panels:
Now Loading